U.S. Army test-range reservation system averages 33 days
The U.S. Army’s online test-range reservation system averages 33 days, has completed 15 tests and opened six ranges while working through 156 industry requests.

The U.S. Army’s new online test-range reservation system is averaging 33 days since its August launch, against a goal of no more than 30 days and previous waits of more than a year.
Maj. Gen. Pat Gaydon, commander of U.S. Army Test and Evaluation Command, said Tuesday at an Association of the United States Army (AUSA) event near Washington, D.C., that early results average 33 days. “There’s a perception that testing takes too long to get onto ranges, and at places like White Sands Missile Range—that’s booked out,” he said.
Gaydon said entering White Sands Missile Range can still take a while. He also said the Army has a misperception that every developer must use White Sands; the new system is intended to make several ranges available through faster, flexible scheduling.
How does the reservation system work?
Companies seeking to test a weapon submit a proposal listing proposed dates and a preferred range. Within 24 hours, a scheduling “concierge” calls the company back and arranges a test time, according to the Army’s description of the process.
The Army has made six ranges available through the quick-turnaround reservation system:
- Dugway Proving Ground, Utah
- The West Cibola Range at Yuma Proving Ground, Arizona
- Camp Grayling, Michigan
- Camp Shelby, Mississippi
- Camp Atterbury, Indiana
- An international range near Tan-Tan, Morocco
The Army calls this approach a permissive test range construct, a flexible framework for giving industry access. The construct has also pushed the Army to accelerate invitations to its own exercises and events.
Abby Denburg, president of Covenant Industries, said the change already produced a quick turnaround. The company tested a missile in Morocco 14 days after receiving an Army call that fall.
Denburg said exercise invitations ordinarily arrive about a year ahead, with the final planning conference roughly six months before the event. Because startups can change every one to three weeks, locking configurations six months in advance can prevent the newest technology from reaching exercises.
Why does faster access matter to weapons developers?
Gaydon said flexibility lets companies test early and repeatedly rather than reserve a single one-week window a year or 18 months ahead. His goal is to give firms the ability to test nearly every week or at least once a month, supporting a cycle of flying, failing, fixing and flying again.
That access is especially useful for unmanned systems, systems designed to operate without an onboard person, that rely on artificial-intelligence models. Nathan Diller, president of Mach Industries, said: “What it allows us is very rapid closure on those models, to make sure that you can start to build trust in the models sooner.”
The schedule also supports the Army’s Continuous Transformation philosophy by putting systems into soldiers’ hands earlier. Denburg said this gives end users a chance to test a concept of employment, or how the Army intends to employ a system, and a concept of operations, or how it would conduct the mission, then return feedback.
Gaydon said four priority fields stand to benefit: drones, counter-drone systems, long-range fires and low-cost interceptors. Companies cannot develop and validate the full kill chain, the linked process from finding a target through defeating it, without access to a range and the authorities needed for realistic tests.
If a company owns the full kill chain and a drone or counter-drone system, Gaydon said, the Federal Aviation Administration (FAA) will not allow it to shoot down its own drone in Army airspace.
He also said it is hard on a private range to test how a drone or missile operates in a contested electromagnetic spectrum environment, where competing electronic systems vie for control of radio frequencies, or to secure the required authorities.
The Army will also provide an initial evaluation that companies can use to build confidence in a product. Gaydon said it will issue a memorandum recording that the company came to the range and operated in the environment; companies may use the document with program offices or for other purposes.
What do the first 156 requests show?
The system’s early operating record is substantial but unfinished:
- 156 requests
- More than 60 percent being or already scheduled
- 15 tests completed
- 14 tests ready to proceed
- About 93 requests actively being worked to place companies on a range
The program’s next measure is whether the active requests convert into scheduled tests while the average wait moves from 33 days to 30 days or less.
Original: testrange.army.mil
Tom Whitfield
Show full bio
Correspondent covering regulation, policy and their impact on Civil Service News is the daily trade press at Civil Service News.



